Page 4 of European technical approval ETA–11/0390, issued on 27.08.2012
English translation prepared by CSTB
 
2
Characteristics of product and methods of verification
2.1
Characteristics of product
The Hilti HIT-CT 1 injection adhesive corresponds to the drawings and provisions given in annexes 1
to 7.
The
Hilti
HIT-CT
1
injection
adhesive
is
a
two
components
system.
 
The
two
components
of
the
injection mortar
are delivered in
unmixed condition in foil packs of sizes 330ml or 500ml according to
annex
1. Each
foil
pack is marked with
the
identifying mark “Hilti HIT-CT 1”
with the production
date
and expiration date.
 
2.2
Methods of verification
The assessment of fitness of the rebar connection for the intended use in relation to the requirements
for mechanical resistance and stability and safety in use in the sense of the Essential Requirements 1
and
4 has
been
made in
accordance with
the « Guideline
for
European
Technical
Approval
of
Metal
Anchors
for
use
in
Concrete »,
Part
1
« Anchors
in
general »,
Part
5
« Bonded
anchors »
and
Technical Report n° 023 “Assessment of post installed rebar connections”.
 
In
addition
to
the
specific
clauses
relating
to
dangerous
substances
contained
in
this
European
Technical
Approval,
there
may
be
other
requirements
applicable
to
the
products
falling
within
its
scope
(e.
g.
 
transposed
European
legislation
and
national
laws,
regulations
and
administrative
provisions).
 
In
order
to
meet
the
provisions
of
the
UE
Construction
Products
Directive,
these
requirements need also to be complied with, when and where they apply.
 
3
Evaluation of Conformity and CE marking
3.1
Attestation of conformity system
The
system
of
attestation
of
conformity
2 (i)
(referred
to
as
system 1)
according to
Council
Directive
89/106/EEC Annex III laid down by the European Commission provides:
a) tasks for the manufacturer:
1. factory production control,
2.
further
testing
of
samples
taken
at
the
factory
by
the
manufacturer
in
accordance
with
a
prescribed test plan.
b) tasks for the approved body:
3. initial type-testing of the product,
4. initial inspection of factory and of factory production control,
5. continuous surveillance, assessment and approval of factory production control.
 
 
 
3.2
Responsibilities
3.2.1
Tasks of the manufacturer, factory production control
The
manufacturer
has
a
factory
production
control
system
in
the
plant
and
exercises
permanent
internal
control
of
production.
All
the
elements,
requirements
and
provisions
adopted
by
the
manufacturer are documented in a systematic manner in the form of written policies and procedures.
 
This production control system ensures that the product is in conformity with the European Technical
Approval.
 
The
manufacturer
shall
only
use
raw
materials
supplied
with
the
relevant
inspection
documents
as
laid
down
in
the
prescribed
test
plan
1
.
 
The
incoming
raw
materials
shall
be
subject
to
controls
and
tests by the manufacturer before acceptance.
Check of incoming materials shall include control of the
inspection documents presented by suppliers.
 
 
1
 
The prescribed test plan has been deposited at the Centre Scientifique et Technique du Bâtiment and is only made available
to the approved bodies involved in the conformity attestation procedure.