Page 30 of European technical approval ETA–11/0390, issued on 27.08.2012
English translation prepared by CSTB
 
 
 
 
 
 
of the European
Technical Approval
 
ETA - 11/0390
Injection System Hilti HIT-CT 1 for rebar connection
Values for pre-calculation of lap splice length with Hilti HIT-CT 1
 
Examples for the lap splice length
1)
for rebars (f
y,k
= 500 MPa) in C20/25 (f
bd
= 2,3 MPa)
Rebar  
Ø
1
=
2
=
3
=
4
=
5
= 1,0
2
or
 
5
= 0,7
1
=
3
=
4
= 1,0
Anchorage
length   
l
bd
 
Tension  
load
N
Rd
 
Mortar
volume  
V
2)
Anchorage
length   
l
bd
 
Tension  
load
N
Rd
 
Mortar
volume  
V
2)
 
[mm]
[mm]
[kN]
[ml]
[mm]
[kN]
[ml]
8
200
11,6
9 (4)
200
16,5
15 (7)
260
15,0
15 (7)
220
18,2
17 (7)
320
18,5
22
240
19,8
18 (8)
379
21,9
29
265
21,9
20
10
200
14,5
13 (6)
200
20,6
18 (8)
290
21,0
23 (10)
240
24,8
22 (10)
380
27,5
33
290
29,9
26
472
34,1
43
330
34,1
30
12
200
17,3
18 (8)
200
24,8
21 (10)
320
27,7
32
270
33,4
29
440
38,2
45
330
40,9
35
567
49,2
60
397
49,2
42
14
210
21,2
24
210
30,3
25
360
36,4
42
290
41,9
35
510
51,6
62
380
54,9
46
661
66,9
80
463
66,9
56
16
240
27,7
31
240
39,6
33
390
45,1
52
340
56,2
46
550
63,6
73
430
71,0
58
700
80,9
95
529
87,4
72
18
270
35,1
38
270
50,2
41
410
53,3
60
380
70,6
57
560
72,8
83
490
91,0
74
700
91,0
106
595
110,6
90
20
300
43,4
60
300
61,9
64
370
53,5
76
370
76,4
78
430
62,1
91
430
88,8
91
500
72,3
106
500
103,2
106
22
330
52,5
88
330
74,9
93
390
62,0
105
390
88,6
110
440
69,9
124
440
99,9
124
500
79,5
141
500
113,5
141
24
340
59,0
144
360
89,2
152
360
62,4
165
410
101,6
173
450
78,0
190
450
111,5
190
500
86,7
211
500
123,9
211
25
375
67,7
133
375
96,8
141
420
75,9
150
420
108,4
158
460
83,1
169
460
118,7
173
500
90,3
188
500
129,0
188
1)
  
Tabulated
 
maximum tension loads are valid for good bond conditions according to EN 1992-1-1. For all other bond
conditions the values for tension loads must be multiplied by 0.7.
2)
    
The volume V of mortar can be estimated using the equation V = 1,2·(d
0
²-d²)·
·l
bd
/4;  
values in (brackets) correspond to min.
 hole diameter
 
 
Annex 20
 
Pre-calculated values for lap splice length     
Example: rebar (f