1 .. 19 20 21 22 23 24 25 26 27 28 29 30
Page 25 of European Technical Approval ETA-11/0390, issued on 27.08.2012
English translation prepared by CSTB
 
 
 
 
 
 
of  the European
Technical Approval
 
ETA - 11/0390
Injection System Hilti HIT-CT 1 for rebar connection
 
 
Overhead application:  
Support the rebar and secure it from falling till mortar
started to harden, e.g.
 using HIT-OHW
 
HIT-OHW
 
Full load may be applied only after the curing time “t
cure
has elapsed (see Table 6).
 
 
 
Table 6:  
Working time, curing time
1)
Base material temperature
Working time “t
gel
Curing time “t
cure
 
-5 °C
 
T
base material
 
 
0°C
 
60  
min
 
6
h
 
0 °C
 
T
base material
 
 
5°C
 
40  
min
 
3
h
 
5 °C
 
T
base material
 
10°C
 
25  
min
 
2
h
 
10 °C
 
T
base material
 
 
20°C
 
10 min
 
90
min
 
20 °C
 
T
base material
 
 
30°C
 
4 min
 
75
min
 
30 °C
 
T
base material
 
40 °C
 
2  
min
 
60
min
1)
The curing time data are valid for dry anchorage base only.
 
In water saturated anchorage base the curing times must be doubled.
 
 
 
 
Annex 15
 
Installation instruction VII
Working and curing time